Building a new home often takes months. During this time, you may need to consider other living arrangements or deal with selling your current property. This makes understanding the timeframe very important.

Here’s a quick look at how long it takes to build new construction homes in Greenwood, SC.

Initial Planning

The first stage of construction involves planning. This can take anywhere from one to three months.

During the planning phase, you work with architects to design the home. You also secure any necessary approvals and permits.

Site Preparation

Once permits are in place, the home builder starts on-site prep. This includes clearing and grading the land and laying the foundation. This may take up to two months.

The timeframe depends on the size and complexity of the site, weather conditions, and availability.

Framing and Exterior Work

Framing the house and completing the exterior work is the next major step. This involves constructing the frame, installing the roof, and adding windows and doors. It may take about three months to complete.

Interior Work and Finishing Touches

Interior work includes electrical, plumbing, HVAC installation, insulation, and drywall. This is an extensive stage and may take two to four months.

Once the major systems are installed, finishing touches are added. This includes flooring, painting, cabinetry, and fixtures. This phase often takes one to two months.

In the end, it may take 6 to 12 months to complete new construction homes in Greenwood, SC.
Weather, design features, and the availability of materials and labor all affect the timeframe. Use these estimates to set realistic expectations and plan accordingly.